Original EA Amendment

4.3.5. Deposition Volumes

Tailings deposition into the Upper Mundic Gully TSF was modelled using Muck3D to estimate the

maximum available tailings storage and to develop the construction staging of the embankment. The

estimated volumes for the two embankment stages are presented in Table 28 including sufficient

storage to contain the PMP runoff.

Table 28. Estimated Tailings Storage

Elevation (m

Tailings beach

Tailings Storage (Mm 3 )

Tailings

Water Storage (Mm 3 )1

Stage

RL)

(m RL)

Storage (Mt)

1

360

350.3

1.15

1.26

1.32

2

390

386.8

8.09

8.9

1.32

Total

NA

NA

9.24

10.16

1.32

(1) Required PMP storage does not include operational pond volumes

Resultant tailings beach surface stage-storage curves are presented in Figure 27 to Figure 30.

Figure 27. Stage 1 Tailings Beach Surface

94

Wulguru Technical Services Pty Ltd – Supporting Information to Amend an Environmental Authority