Original EA Amendment

Table 9. Annual Fuel Consumption

Estimated Annual Fuel Consumption

Transport Purposes Diesel oil (Euro iv or higher)

Stationary Purposes

Year

Diesel oil

(kL)

(kL)

2028 2029 2030 2031 2032 2033 2034

63.9975

782.91102

5.475 5.475 5.475 5.475 5.475 28.98

0 0 0 0 0

330.141359

6.2. Scope 2 Emissions The main source for Scope 2 Emissions for the Project is expected to be electricity usage in pump systems. Pump powers were estimated using flow rates determined in the water balance for the Project (GHD, 2025) and estimated head for each pump. The hours of operation for each pump assume constant use throughout each phase. The electricity usage per year for each phase is shown in Table 10 and the expected electricity usage by year is shown in Table 11.

Table 10. Electricity usage for each Project phase.

Pump Power (kW)

Electricity Usage per Year (MWh)

Hours per year

Phase

Activity

Construction 2028

Dewatering Pump

2495.5

5

5.2

Water Plant Discharge Pump System Return to Water Plant Pump OCP to UMG Transfer Pump

8760 8760 8760

47 24

409.2 207.4 42.6

Operation 2029-2033

5

Table 11. Electricity usage by year.

Calendar Year

Electricity Usage (MWh)

5.24055 659.27 659.27 659.27 659.27 659.27

2028 2029 2030 2031 2032 2033 2034

0