1. Introduction
Wulguru Technical Services Pty Ltd (WTS) was engaged by Heritage Minerals Pty Ltd owner and
operator of the Mount Morgan Mine, to prepare supporting information for amendments to
Environmental Authority (EA) EPML00433013, current 26 May 2025.
This supporting information report is submitted to the Department of Environment and Science (DETSI)
in support of Heritage Mineral’s application to amend the EA. This supporting information report has
been produced to satisfy requirements of section 226 and 226A of the Environmental Protection Act
1994 (EP Act) specifically to provide:
• A detailed description of the proposed EA amendments; and
• An assessment of the potential impacts to relevant environmental values, as well as detailing
any relevant managed strategies associated with the proposed EA amendments.
This document complies with the following guidelines:
• Approval processes for Environmental Authorities (DES 2019b);
• Application requirements for activities with impacts to air (DES 2017a);
• Application requirements for activities with impacts to land (DES 2017b);
• Application requirements for activities with impacts to water (DES 2017c);
• Application requirements for activities with noise impacts (DES 2017d); and
• Application requirements for activities with waste impacts (DES 2019a).
1.1. Purpose
The purpose of this document is to describe the existing environmental values and assess the potential
environmental impacts that may arise from the proposed amendments. The proposed amendments
relate to:
• Authorise Upper Mundic Gully TSF by inclusion as a mine feature in the EA;
• Update Table A1, and associated Schedule I Figure 1, to address to be determined (TBDs)
associated with the pipe corridor and exploration mine features; and
• Fix minor erroneous issues in the EA that impact on the processed tailings volumes for
discharge into Sandstone Gully TSF.
The Queensland Environmental Regulator Regulatory Strategy 2022-2027 articulates that a key focus
area for DETSI is to “Regulate proportionate to risk”. To align with this focus area, this supporting
information report provides a risk assessment that has been completed to identify potential impacts of
the proposed amendments and appropriate mitigation measures. A summary of the risks and likely
magnitude of impacts on environmental values is included in Section 2.4 whilst the full risk assessment
is provided in Section 7.
14
Wulguru Technical Services Pty Ltd – Supporting Information Report
Powered by FlippingBook