Original EA Amendment

Aspect

Potential Impact

Risk Rating

Risk Controls

Residual Risk Rating

Treatment

L

C

R

L

C

R

of the 1.5 m concrete plug to be

located in competent rock

approximately 5 m past the tunnel

inlet.

TSF designed by RPEQ in

accordance with DETSI guidelines

and ANCOLD best practice

Installation of liner in embankment to

reduce potential for seepage

Installation of groundwater monitoring bores

Annual regular maintenance

and ongoing monitoring through proposed

inspections in accordance with EA

Release of tailings/

conditions

conditions in Schedule H and the

water from Upper

Manual for Assessing Consequence

Mundic Gully TSF

Regular seepage analysis of piezometers to

Possible High

13

Unlikely Moderate

9

Categories and Hydraulic

causing impact to

be installed within TSF embankment

Performance of Structures

groundwater

Ongoing tailings sampling during tailings

(ESR/2016/1933) .

receptors

discharge to ascertain chemical parameters of

The results of the geochemical

material

modelling provided in Table 29

indicate that the final tailings solution

analytes do no exceed any of the

HILs and it is concluded that leaching

from the tailings material is benign to

human health

202

Wulguru Technical Services Pty Ltd – Supporting Information to Amend an Environmental Authority