Original EA Amendment

12 February 2020

20137096-009 Rev A

Parameter

Design Input

Reference

Embankment control

Downstream toe to RL 260 m

Assumed top of pit

Natural ground elevation

RL 260 m

Survey by client

Starter embankment crest (Raise 1)

RL 290 m

Upstream embankment slope

1V:1.5H

Downstream embankment slope

1V:2.5H

Number of raises

6

APPENDIX A

Final Embankment crest - Raise 6

RL 335 m

Final Embankment length - Raise 6

850 m

Embankment crest control points

Control SP1 E N Control SP2 E N

231037.73 7383294.60 231633.16 7382647.41

Embankment crest width

16 m

Starter embankment construction material

Clay or geomembrane on soil zone upstream with Mine waste rock (NAF) Chimney filter and Gravel wrapped in geotextile

Soil/Clay Waste rock Filter and drainage

Stage 2 to 6 - Embankment construction material

Clay or geomembrane on soil zone upstream with Mine waste rock (NAF and/or PAF) with Chimney filter and Gravel wrapped in geotextile

Soil/Clay Waste rock Filter and drainage

TSF Hazard Category

Consequence Category

TBC

ANCOLD

Severity of damages and losses

TBC

Population at risk (PAR)

TBC

Potential loss of life (PLL)

TBC

Stability – Acceptable Factors of Safety (FoS)

7

Powered by