Original EA Amendment

12 February 2020

20137096-009 Rev A

Figure 2: TSF capacity stage storage curve.

5.0 EMBANKMENT DESIGN

A typical cross-section through the proposed waste rock embankment is shown in Figure 3, with a drawing contained in APPENDIX A.

Seepage drain

Tailings

Waste rock

Soil/clay

Figure 3: Cross-section through embankment, showing zoning.

The embankment is designed to be raised downstream progressively as the tailings fills the available storage space. The initial construction will be a Starter Dam, that will be around 30 m high. In this way the

11