Original EA Amendment

12 February 2020

20137096-009 Rev A

Table 7: Provisional Bill of Quantities.

Quantities

Item no. Description

Units

1.0

Site clearance

1.1

Top surface cleaning and grubbing

Ha

TBC

1.2

Removal of buried services (if any)

Each

TBC (if any)

m 3

1.3

Removal/lowering the water in the pit

TBC

2.0

Excavation

Mm 3

2.1

Tailings within the footprint to RL 272 m

0.37

Mm 3

2.2

Lime stockpile

TBC

Mm 3

2.3

Borrow material for TSF construction

TBC

3.0

Catchment diversion drain (114 Ha) to RL 335 m

Mm 3

3.1

Excavation

TBC

4.0

Stage 1 to RL 290 m

Stage 1 removal of 300 mm (indicative) topsoil to be stockpiled

m 3

4.1

14,900

m 3

Option 1 – Clay upstream liner (zone 1) Alternative Option 2 - Geomembrane upstream liner (HDPE)

Included in Item 4.3

4.2

m 2

16,400

m 3

4.3

Embankment fill (zone 3)

670,200

m 3

4.4

Chimney filter (zone 2B)

14,400

m 3

4.5

Blanket filter (zone 2B)

15,750

m 2

4.6

Geotextile to wrap blanket filter

63,000

5.0

Stage 2 to RL 300 m

Stage 2 removal of 300 mm (indicative) topsoil to be stockpiled

m 3

5.1

8,100

m 3

Option 1 – Clay upstream liner (zone 1) Alternative Option 2 - Geomembrane upstream liner (HDPE)

36,050

5.2

m 2

9,150

m 3

5.3

Embankment fill (zone 3)

607,000

m 3

5.4

Chimney filter (zone 2B)

7,550

m 3

5.5

Blanket filter (zone 2B)

13,400

m 2

5.6

Geotextile to wrap blanket filter

53,600