Mt Morgan Gold Mine
Upper Mundic Gully TSF
Stage 1 Sunny Day Failure: Maximum Flood Depth (m)
Mt Morgan Gold Mine
Mt Morgan
LEGEND
0.25 0.50 0.75 1.00 1.25 1.50 2.00 Maximum Flood Depth (m)
Zoomed Extent Embankment Extent Tailings Extent
1:54000 Scale Bar
800 m
NOTES
1. Base and Key Map: © Open Street Map 2. Base Map Source: Imagery © 2024 Nearmap
Downstream modelling limit
Client:
Heritage Tailings
Proj #:
PS213278 C 2024-12-13
Rev:
Date: Designed: Prepared:
AR
RC Reviewed: MN Approved: NM Figure No: B 01
ISSUED FOR APPROVAL DRAFT
© WSP Australia Pty Ltd ("WSP") Copyright in the drawings, information and data recorded ("the information") is the property of WSP. This document and the information are solely for the use of the authorised recipient and this document may not be used, copied or reproduced in whole or part for any purpose other than that which it was supplied by WSP. WSP makes no representation, undertakes no duty and accepts no responsibility to any third party who may use or rely upon this document or the information. NCSI Certified Quality System to ISO 9001. © APPROVED FOR AND ON
229000
230000
231000
232000
233000
234000
BEHALF OF WSP Australia Pty Ltd. www.wsp.com
Powered by FlippingBook