Original EA Amendment

LEGEND

210

EXISTING GROUND SURFACE AT 2 m CONTOUR INTERVALS

210

STAGE 1 EMBANKMENT DESIGN AT 2 m CONTOUR INTERVALS

210

STAGE 2 EMBANKMENT DESIGN AT 2 m CONTOUR INTERVALS

STAGE 1 INDICATIVE STORAGE FOOTPRINT

STAGE 2 INDICATIVE STORAGE FOOTPRINT

EXISTING STORMWATER DIVERSION TUNNEL

INDICATIVE LINER EXTENT

EXISTING MINESPOIL DUMP EXTENT

INDICATIVE STAGE 1 STORAGE FOOTPRINT RL 360 m

INDICATIVE EMBANKMENT FOOTPRINT STAGE 1 - REFER DRG 003

DAM 8

INDICATIVE STORAGE FOOTPRINT RL 390 m

7 384 000 N

7 384 000 N

TUNNEL OUTLET (NORTH EAST)

EXISTING STORMWATER DIVERSION TUNNEL REFER DRG 006

A 005

TUNNEL INLET (SOUTH WEST)

STAGE 2 EMBANKMENT REFER DRG 004

LINING REQUIREMENTS AND EXTENTS TO BE CONFIRMED'

400

7 383 500 N

7 383 500 N

OPEN CUT PIT

NOT FOR CONSTRUCTION PRELIMINARY

EXISTING MINESPOIL DUMP EXTENTS

0

100

200

1:5,000

METRES

CLIENT

PROJECT

HERITAGE MINERALS

MOUNT MORGAN GOLD PROJECT UPPER MUNDIC GULLY - TSF CONCEPT DESIGN

TITLE

CONSULTANT

BRISBANE OFFICE 900 ANN STREET FORTITUDE VALLEY, QLD 4006 AUSTRALIA [+61] (7) 3854 6200

GENERAL ARRANGEMENT PLAN

B 2025-07-04 PRELIMINARY - NOT FOR CONSTRUCTION

DT/DW

EN/TD

MJG

MJG

A 2024-08-26 DRAFT - FOR INFORMATION ONLY

DT/DW

EN/TD

MJG

MJG

DOCUMENT No. 019

2 6 of

FIGURE 002

PS2132478 PROJECT NO.

REV.

B

DESCRIPTION YYYY-MM-DD

PREPARED REVIEWED APPROVED DESIGNED

REV.