Original EA Amendment

LEGEND

210

EXISTING GROUND SURFACE AT 2 m CONTOUR INTERVALS

210

STAGE 1 EMBANKMENT DESIGN AT 2 m CONTOUR INTERVALS

STAGE 1 INDICATIVE STORAGE FOOTPRINT

EXISTING STORMWATER DIVERSION TUNNEL

MASS CONCRETE PLUG

MINE SPOIL (SIZING TBC)

ORIGINAL GROUND PRE MINING

330

340

MINE SPOIL

MASS CONCRETE PLUG

350

STAGE 2 EMBANKMENT EXTENT

360

360 356 358

352 354

350 346 348

EXISTING STORMWATER DIVERSION TUNNEL

EMBANKMENT-PLAN VIEW SCALE 1:2,500 m

STAGE 1 EMBANKMENT CREST LEVEL

REMOVAL OF MATERIAL MAY BE DIRECTED BY THE DESIGN REPRESENTATIVE TO PROVIDE SUITABLE SUBGRADE CONDITIONS

EXISTING STORMWATER DIVERSION TUNNEL (PROJ)

DATUM 300.00

STAGE 1 CREST LEVEL (m)

EXISTING GROUND

CUT AND FILL DEPTH (m)

NOT FOR CONSTRUCTION PRELIMINARY

CHAINAGE

EMBANKMENT-LONGITUDINAL SECTION SCALE 1:2,500 m

0

50

100

1:2,500

METRES

CLIENT

PROJECT

HERITAGE MINERALS

MOUNT MORGAN GOLD PROJECT UPPER MUNDIC GULLY - TSF CONCEPT DESIGN

TITLE

CONSULTANT

BRISBANE OFFICE 900 ANN STREET FORTITUDE VALLEY, QLD 4006 AUSTRALIA [+61] (7) 3854 6200

PLAN AND LONGITUDINAL SECTION - STAGE 1

B 2025-07-04 PRELIMINARY - NOT FOR CONSTRUCTION

DT/DW

EN/TD

MJG

MJG

A 2024-08-26 DRAFT - FOR INFORMATION ONLY

DT/DW

EN/TD

MJG

MJG

DOCUMENT No. 019

3 6 of

FIGURE 003

PS2132478 PROJECT NO.

REV.

B

DESCRIPTION YYYY-MM-DD

PREPARED REVIEWED APPROVED DESIGNED

REV.