Original EA Amendment

330

340

STAGE 1 EMBANKMENT EXTENT

350

MASS CONCRETE PLUG AND MINE SPOIL ZONE

360

EXISTING STORMWATER DIVERSION TUNNEL

370

380

STAGE 2 EMBANKMENT PAVED CREST NOM. 10m WIDE

0

50

100

1:2,500

METRES

380

LEGEND

210

EXISTING GROUND SURFACE AT 2 m CONTOUR INTERVALS

210

370

STAGE 1 EMBANKMENT DESIGN AT 2 m CONTOUR INTERVALS

210

STAGE 2 EMBANKMENT DESIGN AT 2 m CONTOUR INTERVALS

360

EXISTING STORMWATER DIVERSION TUNNEL

MASS CONCRETE PLUG

350

MINE SPOIL (SIZING TBC)

ORIGINAL GROUND PRE MINING

EMBANKMENT-PLAN VIEW SCALE 1:2,500 m

STAGE 2 EMBANKMENT CREST LEVEL

INDICATIVE CROSSING - EXISTING STORMWATER DIVERSION TUNNEL

DATUM 315.00

STAGE 2 CREST LEVEL (m)

EXISTING GROUND

CUT AND FILL DEPTH (m)

CHAINAGE

NOT FOR CONSTRUCTION PRELIMINARY

EMBANKMENT-LONGITUDINAL SECTION SCALE 1:2,500 m

CLIENT

PROJECT

HERITAGE MINERALS

MOUNT MORGAN GOLD PROJECT UPPER MUNDIC GULLY - TSF CONCEPT DESIGN

TITLE

CONSULTANT

BRISBANE OFFICE 900 ANN STREET FORTITUDE VALLEY, QLD 4006 AUSTRALIA [+61] (7) 3854 6200

PLAN AND LONGITUDINAL SECTION - STAGE 2

B 2025-07-04 PRELIMINARY - NOT FOR CONSTRUCTION

DT/DW

EN/TD

MJG

MJG

A 2024-08-26 DRAFT - FOR INFORMATION ONLY

DT/DW

EN/TD

MJG

MJG

DOCUMENT No. 019

4 6 of

FIGURE 004

PS2132478 PROJECT NO.

REV.

B