Original EA Amendment

Advantages

Option

Disadvantages

limits the maximum height to Stage 4. Constructing higher stages results in the embankment potentially overlying the Mundic Gully failure point which can not be remediated until latent tailings are removed from this mine feature Requires an amendment to the EA Water balance modelling undertaken as part of a previous EA amendment indicates that further deposition of processed tailings into the OCP is not viable as it slightly increases potential risks that may contribute to an uncontrollable overtopping event in an extreme weather event. Requires an amendment to the EA Regulations would not permit the storage of tailings in a storage tank Risks associated with overtopping events if tailings volumes are greater than forecasted Not a permanent solution to tailings management

Permanently stores processed tailings

Discharge additional processed tailings into the OCP

Store produced tailings in storage tanks

Temporarily stores processed tailings

3.2.2. Amendment #2

There are no viable alternatives to Amendment #2 as updating Table A1 and associated Schedule 1 -

Figure 1 in the EA is required to facilitate that the EA holder can lawfully conduct mining activities and

not be in breach of relevant conditions.

3.2.3. Amendment #3

There are no viable alternatives to Amendment #3 as fixing erroneous information in the EA is required

to facilitate that the EA holder can lawfully conduct mining activities and not be in breach of relevant

conditions.

3.3. Standard Criteria Assessment

The EP Act requires ERAs to be authorised by DETSI. When considering an application to amend an

EA or when deciding on the conditions of an EA, DETSI must consider certain matters set out under

the EP Act. One of those matters is the ‘Standard Criteria’. The purpose of this assessment is to address

each of these criteria to demonstrate how they will be met by Heritage Minerals for the amendments

described within. An assessment of the proposed amendments against the standard criteria is provided

in Table 16.