PHASE 2: MONTH 12 to 50
INFLOWS
OUTFLOWS
1752 ML/ann Dee River and Sludge
DOR WTP
1752 ML/ann
0
DOR WTP Transfer
1752 ML/ann
801 ML/ann
DOR WTP Transfer
430 ML/ann
Seepage Pumpback
Enhanced Evaporation
312 ML/ann
535 ML/ann
Rainfall and Runoff
Natural Evaporation
OCP
486 ML/ann Seepage Losses
3382 ML/ann
-793
Tailings Water to OCP
2870 ML/ann Return water to plant
785 ML/ann SSG to OCP Pumped Transfer
785 ML/ann SSG to OCP
3 ML/ann
Seepage Losses
583 ML/ann
23 ML/ann
Rainfall and Runoff
Natural Evaporation
SSGArea
219 ML/ann
0 ML/ann
Tailings Release 39 ML/period Basin 1&2 Spill
Spills to OCP
29
2870 ML/ann
3387 ML/ann
Return water to plant
Tailings Water to OCP
137 ML/ann Raw water from external source
377 ML/ann Ore Moisture
Process Plant
-2
NET SYSTEM BALANCE: -766
Figure A.2
Simulated mean forecast water balance for Phase 2 (OCP as the TSF)
12624987 | Heritage Minerals EA Amendment Application – Updates to Water Balance Model July 2025 (Final) 13