Technical Discipline
Proposed works
Conditioning Approach
Timeframe
Groundwater
Execution of the proposed groundwater model updates summarised in Section 6.6.9
Prior to the construction of the Upper Mundic Gully Tailings Storage Facility, the environmental authority holder must update the existing site wide groundwater model to incorporate the Upper Mundic Gully Tailings Storage Facility. Potential condition to include a commitment to provide the groundwater monitoring plan to the administering authority
TBD
Groundwater
Develop long term groundwater monitoring plan including post-closure monitoring requirements and measures
TBD
Cycas management plan Grevillea management plan
Implement management plan
Proposed conditions included in application Proposed conditions included in application
Prior to TSF construction Prior to TSF construction
Implement management plan