3.2 Failure location In accordance with the criteria described in Section 2.3, the failure locations for both Stages 1 and 2 were selected to maximise the tailings release. Figure 3.1 and Figure 3.2 display the Upper Mundic Gully TSF failure locations selected for this assessment for each embankment layout. These locations were chosen because they align with the highest section of the embankment and are expected to generate a larger release volume compared to other locations.
Figure3.1
Proposed breach location for Upper Mundic Gully TSF Stage 1
Figure3.2
Proposed breach location for Upper Mundic Gully TSF Stage 2
Project No PS213278 Upper Mundic Gully TSF Stage 1 and 2 DBA and CCA Mount Morgan Gold Mine Heritage Minerals