Mount Morgan Mine Upper Mundic Gully TSF EA Amendment

Parameter

Stage 1

Stage 2

Unit

Estimated released volume

0.75

3.6

Mm³

Bottom breach width

16.3

12.5

m

Breach slopes

0.6

0.6

H:1V

Formation time

0.84

0.27

hr

4.3 Outflow hydrographs Outflow hydrographs were derived following standard breach routing equations by Fread (1988) implemented in the software HEC-HMS version 4.12. Hydrograph estimations consider the unique stage-storage relationship of the outflow breach and breach parameters presented in Table 4.3. Table 4.4 summarises the resulting peak flows for each of the assessed scenarios. Derived breach hydrographs are provided in Figure 4.5 and Figure 4.6.

Table4.4

Upper Mundic Gully TSF breach hydrographs

Peak outflow rate (m 3 /s)

Embankment

Stage 1

169

Stage 2

7,077

180

160

140

120

100

80

60

40

20

0

0

50

100

150

200

250

300

350

400

450

500

Time (min)

Figure4.5

Stage 1 failure outflow hydrograph

Project No PS213278 Upper Mundic Gully TSF Stage 1 and 2 DBA and CCA Mount Morgan Gold Mine Heritage Minerals

WSP May 2026 Page 17