Mount Morgan Mine Upper Mundic Gully TSF EA Amendment

Item

Stage 1

Stage 2

General economic loss or property damage

Low No bores used for water supply have been identified in the vicinity of the TSF or in the direction of the groundwater flow. Therefore, loss of agriculture and/or stock is not expected.

Same as Stage 1.

Overall consequence classification

Significant

Significant

Project No PS213278 Upper Mundic Gully TSF Stage 1 and 2 DBA and CCA Mount Morgan Gold Mine Heritage Minerals

WSP May 2026 Page 35