Table 8
Proposed Table F1 Replacement
Mine Feature
Operational Activities
Process Plant & ROM Pad
Mineral processing
Pipe Corridor
Transport of process water and tailings.
Part of No. 2 Mill Tailings Dam
Shape surface to minimise runoff of contaminated water. Install diversions to minimise clean waters entering location Remove overlying waste. Recover tailings for processing. Remove and relocate any waste in the remnant walls that directly impacts the mining of the tailings. Leave stable batters on any remaining waste dumps or remnant walls. Remove overlying waste. Recover tailings for processing. Remove and relocate any waste in the remanent walls that directly impacts the mining of the tailings. Leave stable batters on any remaining waste dumps or remnant walls. Remove overlying waste. Recover tailings for processing. Remove and relocate any waste in the remanent walls that directly impacts the mining of the tailings. Leave stable batters on any remaining waste dumps or remnant walls. Shape surface to minimise runoff of contaminated water. Install diversions to minimise clean waters entering location. Remove overlying waste. Recover tailings for processing. Remove and relocate any waste in the remanent walls that directly impacts the mining of the tailings. Leave stable batters on any remaining waste dumps or remnant walls. Establish bund/sump. Recover waste rock crush at site and truck material to plant. Expose former natural land surface. Leave stable batters on any remaining waste dumps or remnant walls. Placement of waste rock Shape and compact placed waste to reduce rainfall infiltration and clean water runoff Placement of waste rock Shape and compact placed waste to reduce rainfall infiltration and clean water runoff Placement of waste rock Shape and compact placed waste to reduce rainfall infiltration and clean water runoff Remove overlying waste. Recover tailings for reprocessing. Remove and relocate any waste in the remnant walls that directly impacts the mining of the tailings. Permanent storage of tailings. Collection and monitoring of seepage within new embankment. Construction of tailings dam wall
Mundic Sulphide Tails
Red Oxide Tails
Part of Shepherds Gully Tails
B Dump
K Dump Q Dump Shepherds Outer Dump
Horse Paddock Dump
Airfield Dump
Sandstone Gully Latent Tailings
Sandstone Gully Tailings Storage Facility
Upper Mundic Gully Tailings Storage Facility
Permanent storage of tailings.
Project number: 25B061
Page 29
Powered by FlippingBook