Mount Morgan Mine Upper Mundic Gully TSF EA Amendment

Table 68. Consequence Classification

A.

Insignifican t

B.

Minor

C.

Moderate

Category

D Major

E. Catastrophic

Environmental

Minor localized environmental harm rectified within hours. No

Minor transient environmental harm that requires days for recovery. No

Significant environmental harm that requires weeks for recovery. Environmental

Very serious long term environmental harm or contamination that takes years

Severe environmental harm or contamination resulting in permanent environmental damage.

protected habitat or species affected

protected habitat or species affected.

incident involving protected species or habitat

to recover. Damage to protected species or habitat

Endangered species and habitat destroyed

Health & Safety of People

No injuries requiring any treatment

First aid treatment

Medical treatment required, restricted work injury

Injuries resulting in, lost time, permanent disability, amputation or surgery

Single or multiple fatalities

Table 69. Risk Level Classification Matrix

Likelihood

Consequence

D Major

E Catastrophic

A Insignificant

B Minor

C Moderate

Almost Certain

High (11)

High (16)

Extreme (20)

Extreme (23)

Extreme (25)

Likely

Moderate (7)

High (12)

High (17)

Extreme (21)

Extreme (24)

Possible

Low (4)

Moderate (8)

High (13)

Extreme (18)

Extreme (22)

Unlikely

Low (2)

Low (5)

Moderate (9)

High (14)

Extreme (19)

Rare

Low (1)

Low (3)

Moderate (6)

High (10)

High (15)

L =

Low (1-5)

Broadly acceptable – Manage by routine procedures

M =

Moderate (6-9)

Tolerable – with identified controls fully implemented

H =

High (10-17)

Undesirable – Additional controls required to reduce risk

E =

Extreme (18-25)

Intolerable – Do not start activity

8.4 Risk Assessment Results Risks identified were assessed using the methodology described above and considered the activities subject to these proposed amendments. The resulting assessment including risk controls and treatments is presented in Table 70. All risks considered existing and proposed controls to reduce the level of risk to ALARP.

Project number: 25B061

Page 206

Powered by