Upper Mundic Gully TSF Note (1)
Sandstone Gully TSF
Open Cut Pit
Main TSF Note (1)
Start month End month
Starter
Mt
Mt
Mt
Mt
97.0
118.6
-
-
3.6
-
118.6
125.2
-
-
-
1.1
125.2
136.6
-
-
-
1.9
136.6
146.8
-
-
-
1.7
146.8
174.4
-
-
-
4.6
174.4
206.2
-
-
-
5.3
(1) Forecast tailings deposition presented for UMG TSF Stage 1 and Stage 2. (2) Forecast tailings deposition presented for Main TSF stages 1 to 5.
1.3 Tailing management plan purpose
The purpose of this tailing management plan (TMP) for the UMG TSF is document tailings storage management practices for the life-of-facility (LOF), including:
— Tailings deposition management — Tailings production rate forecast — Tailings characteristics — Long-term tailings deposition strategy — Tailings and water management
— Monitoring and surveillance requirements — Closure and rehabilitation requirements — A high-level failure modes analyses (FMA). This TMP is based on the UMG TSF Conceptual Design to RL 390 m [1] and will be updated, where necessary, fonce the detailed design has been completed.
Project No PS213278 Upper Mundic Gully - Tailings Management Plan Mount Morgan Gold Mine Heritage Minerals
WSP March 2026 Page 2