Mount Morgan Mine Upper Mundic Gully TSF EA Amendment

Upper Mundic Gully TSF Note (1)

Sandstone Gully TSF

Open Cut Pit

Main TSF Note (1)

Start month End month

Starter

Mt

Mt

Mt

Mt

97.0

118.6

-

-

3.6

-

118.6

125.2

-

-

-

1.1

125.2

136.6

-

-

-

1.9

136.6

146.8

-

-

-

1.7

146.8

174.4

-

-

-

4.6

174.4

206.2

-

-

-

5.3

(1) Forecast tailings deposition presented for UMG TSF Stage 1 and Stage 2. (2) Forecast tailings deposition presented for Main TSF stages 1 to 5.

1.3 Tailing management plan purpose

The purpose of this tailing management plan (TMP) for the UMG TSF is document tailings storage management practices for the life-of-facility (LOF), including:

— Tailings deposition management — Tailings production rate forecast — Tailings characteristics — Long-term tailings deposition strategy — Tailings and water management

— Monitoring and surveillance requirements — Closure and rehabilitation requirements — A high-level failure modes analyses (FMA). This TMP is based on the UMG TSF Conceptual Design to RL 390 m [1] and will be updated, where necessary, fonce the detailed design has been completed.

Project No PS213278 Upper Mundic Gully - Tailings Management Plan Mount Morgan Gold Mine Heritage Minerals

WSP March 2026 Page 2