Mine Feature
Rehabilitation
Final Land Use
Land Suitability Objective approximately original contour to Class 4; All other land will be Class 5.
tailings. Batter and stabilise remaining waste dump faces. Expose and reinstate original drainage in rehabilitated areas. Remove remnant sulphidic dam wall that directly impacts the mining of the tailings. Batter and stabilise remaining waste dump faces. Remove remnant sulphidic dam wall that directly impacts the mining of the tailings. Batter and stabilise remaining waste dump faces. Expose and reinstate original drainage in rehabilitated areas. Stabilise former land surface. If required treat surface soils to ensure runoff water quality. Establish suitable vegetation Stabilise former land surface. If required treat surface soils to ensure runoff water quality. Establish suitable vegetation. Stabilise former land surface. If required treat surface soils to ensure runoff water quality. Establish suitable vegetation. Stabilise former land surface. If required treat surface soils to ensure runoff water quality. Establish suitable vegetation. Completely backfilled. PAF waste rock and tailings transferred from stockpiles to void. Water removed. Dry cover – store and release. Drainage system constructed Completely backfilled with tailings. Water removed from surface. Dry cover – store and release installed. Drainage system constructed
Red Oxide Tails
Part of Shepherds Gully Tails
Mining Contractor (Services) Yard
NPAG Stockpile
Slag Stockpiles
B Dump
K Dump Q Dump
Shepherds Outer Dump Horse Paddock Dump Airfield Dump Sandstone Gully TSF
Land management monitoring and maintenance of rehabilitated areas Native Ecosystem
Class 4
Upper Mundic Gully TSF
Powerline
Reshape and rehabilitate
Project number: 25B061