Mount Morgan Mine Upper Mundic Gully TSF EA Amendment

Mine Feature

Rehabilitation

Final Land Use

Land Suitability Objective

Surface Exploration

Backfill exploration holes. Replace vegetation

Land management monitoring and maintenance of rehabilitated areas Land management monitoring and maintenance of rehabilitated areas

Roads

Reshape & rehabilitate

Lachlan’s Laydown

Reshape and rehabilitate

Class 4

Paterson’s Patch Craig’s Clod

Justification for the changes described in Table 10 are as follows: ∕ Inclusion of the Upper Mundic Gully TSF in Table H1 is required to provide central points of the regulated structure. Table 10. Proposed Table H1 Replacement

Regulated Structure

Central Points

Latitude (GDA 94)

Longitude (GDA 94)

Sandstone Gully Tailings Storage Facility

-23.64196

150.36510

Upper Mundic Gully Tailings Storage Facility

-23.62970

150.35353

Justification for changes described in Table 11 are as follows: ∕ Updating the maximum volume of Sandstone Gully TSF, as justified in Section 2.2.3; ∕ Removing reference to “Cyanide” as referencing “Tailings” is sufficient to the purposes of describing the regulated structure; and ∕ Inclusion of the Upper Mundic Gully TSF in Table H2 is required to authorise the consequence category, maximum surface area, maximum volume and purpose. Table 11. Proposed Table H2 Replacement

Name of Regulated Structure

Consequence Category

Maximum Surface area (ha)

Maximum volume (m 3 )

Purpose of Regulated Structure

Sandstone Gully Tailings Storage Facility Upper Mundic Gully Tailings Storage Facility

High

49.2

11,532,416

Storage of Cyanide Tailings

Significant

43.4

9,240,000

Storage of Tailings

Justification for changes described in Table 11 are as follows: ∕ The existing values in Table H3 relating to spillway, DSA and MRL do not reflect the ‘High’ consequence category for Dam Break (and ‘Low’ for Overtopping and Seepage);

Project number: 25B061

Page 32