Mount Morgan Mine Upper Mundic Gully TSF EA Amendment

6.4 Potential failure pathways

The potential failure pathways assessed for UMG TSF are presented in Appendix B. The failure pathways are considered credible but the consequence and likelihood of failure for each have not been assessed.

6.5 Mitigation strategies

Discussion on mitigation strategies for the identified failure pathways is presented in Table 6.3.

Table 6.3

Mitigation Strategies for identified failure pathways

Mitigation strategy Description

Responsibility

Planning and design

Comprehensive geotechnical investigation to identify and characterise weak / loose / permeable foundation zones, defects and soil parameters through drilling, sampling and lab testing. Supports stability, seepage and settlement assessment. Develop a geological model using available survey, aerial imagery and geotechnical investigation to understand subsurface variability.

Geotechnical investigation

Heritage / WSP

Geological ground model

WSP

Model seepage pathways through embankment and foundation; evaluate hydraulic gradients and required controls. WSP

Seepage assessment

Analyse embankment stability under static, seismic and post seismic pore pressure conditions.

Slope stability assessment

WSP

Assess flood levels, spillway capacity, water balance, DSA requirement, return water pump sizing, and impacts on freeboard and overtopping risk. WSP Apply appropriate safety margins for freeboard, loading, material tolerances and uncertainties. Specification of materials and development of a technical specification. WSP Design upstream geomembrane liner to limit seepage; extend and anchor beyond abutments. WSP

Hydraulic assessment

Engineering design

Lining system

Additional freeboard above flood level

Provide additional freeboard above design flood level to accommodate settlement and wave run up. Identify and design appropriate spillway arrangement for extreme flood events for closure. Design stable and serviceable access routes supporting TSF operation and monitoring Develop preliminary closure approach consistent with long term stability and seepage controls.

WSP

Closure spillway

WSP

Access / haul road design

Heritage

Conceptual closure design

Heritage / WSP

Construction

Project No PS213278 Upper Mundic Gully - Tailings Management Plan Mount Morgan Gold Mine Heritage Minerals

WSP March 2026 Page 11