Mitigation strategy Description
Responsibility
Mandatory inspection and sign off for foundation preparation, liner installation, fill placement and other critical stages. Material verification, compaction testing, installation checks and adherence to design specifications.
Construction quality control / quality assurance (QA / QC)
Contractor / Construction certifier Contractor / Construction certifier
Proper jointing, pressure testing and inspection to avoid rupture and operational errors that may cause overtopping or piping.
Pipeline QA / QC
Operation
Instrumentation such as piezometers, inclinometers, and settlement plates will be included at critical locations to monitor the performance of the embankment. Maintain instrumentation on pipelines to detect leakage, over pressurisation, or failure that could discharge onto the embankment. Routine inspections to identify erosion, cracking, seepage, settlement, liner defects, and pipeline leaks. Maintenance and surveillance to be carried out in accordance with the OMS manual and escalation to occur in accordance with the TARP to identify and address potential issues in a timely manner.
TSF Instrumentation
Heritage
Pipeline instrumentation
Heritage
Routine inspections
Heritage
OMS manual and TARP
Heritage
Project No PS213278 Upper Mundic Gully - Tailings Management Plan Mount Morgan Gold Mine Heritage Minerals
WSP March 2026 Page 12