Mount Morgan Mine Upper Mundic Gully TSF EA Amendment

5. Proposed TSF The Upper Mundic Gully TSF has been designed by a Register Professional Engineer Queensland (RPEQ) from WSP. The Upper Mundic Gully TSF is proposed to be constructed in two stages as referenced below: ∕ Stage 1 – Reshape of existing mine spoil dump and construct starter embankment to RL 360m; and ∕ Stage 2 – Raise embankment across top of spoil dump to top of gully ridgeline to RL 390m. The staged approach to construction provides benefits in terms of reducing initial borrowing of material to construct the embankment and construct a TSF that can accommodate potential water balance sensitivities acknowledging climate uncertainties. The concept design drawings for the TSF are presented in this report as follows (higher resolution images are included in Appendix D): ∕ Figure 19: General Arrangement Plan; ∕ Figure 20: Plan and Longitudinal Section Stage 1; ∕ Figure 21: Plan and Longitudinal Section Stage 2; and ∕ Figure 22: Typical Embankment Section.

Project number: 25B061

Page 63