Mount Morgan Mine Upper Mundic Gully TSF EA Amendment

5.1 Basis of Design Design of the Upper Mundic Gully TSF has been undertaken by WSP and overseen by an RPEQ in accordance with the following guidelines: ∕ DETSI Manual for assessing consequence categories and hydraulic performance of structures; ∕ DETSI Structures which are dams or levees construction as part of environmentally relevant activities; ∕ ANCOLD Guidelines on Risk Assessment; ∕ ANCOLD Guideline on the Consequence Categories for Dams; ∕ ANCOLD Guideline on Tailings Dams Planning, Design, Construction, Operation and Closure; ∕ ANCOLD Guidelines or Design of Dams and Appurtenant Structures for Earthquakes; and ∕ Australian Rainfall and Runoff, A Guide to Flood Estimation. The design criteria and basis of design values adopted for the Upper Mundic Gully TSF are provided in Table 21. Table 21. Design Criteria and basis of design

Description

Criteria

Units

Basis Value

Source

General Design Survey

-

-

Existing ground combined surface and provided pre mine combined surface

Heritage Minerals

Survey system

-

-

MGA94 Zone 56

Heritage Minerals

Survey datum

Australian Height Datum

Heritage Minerals

Consequence Category Consequence Category

ANCOLD

Stage 1: Significant Stage 2: High B Stage 1: Low Stage 2: Significant

WSP

DETSI

WSP

TSF Embankment Crest width

Light traffic

M

10

WSP

Batter slopes

Geotechnical Requirements

H:V

2.5:1

WSP

Embankment

Mine spoil

-

Zoned with upstream liner

WSP

Stage 1 – Crest elevation Stage 2 – Crest elevation Tailings Specific gravity of tailings

RL m

360

WSP

RL m

390

WSP

-

-

3.02

Heritage Minerals

Slurry solids content

-

%W/W

40

Heritage Minerals