Mount Morgan Mine Upper Mundic Gully TSF EA Amendment

Description

Criteria

Units

Basis Value

Source

Tailings average settled dry density Tailings beach slope Tailings storage requirement

-

t/m 3

1.10

WSP

-

%

0.5

Heritage Minerals

-

Mt

Maximum feasible storage

Heritage Minerals

Water Management Minimum freeboard -

m

1

WSP

Wet season water storage allowance

1:100 AEP 3 month wet seasons rainfall depth 120 hr probable maximum precipitation 1:1,000 AEP 72 hr storm

mm

1,260

WSP – Wattle Gully Dam Break Report

Design flood event

mm

2,620

WSP – Wattle Gully Dam Break Report

Extreme storm storage Minimum decant pond depth

mm

1,020

WSP – Wattle Gully Dam Break Report

-

m

No allowance

-

5.2 Ancillary Infrastructure To support both TSF construction and operation, ancillary infrastructure is required to be applied for in the EA amendment. The proposed ancillary infrastructure includes: ∕ Pipeline corridor; ∕ Laydown yard; ∕ Onsite nursery; ∕ Topsoil stockpile; and ∕ Extension of haul road. All locations have been positioned on areas already disturbed by historical mining activities (including access tracks) to reduce potential environmental harm associated with disturbing new areas. Ancillary locations are shown on Figure 23.