Original EA Amendment

EA Condition

Action Program

(a) address the complaint including the use of appropriate dispute resolution if required; and (b) immediately implement vibration abatement measures so that vibration from the activity does not result in further environmental nuisance.

activities being undertaken during the term of this PoO, it is anticipated that monitoring will not be required.

Department Interest – Waste Storage of tyres E1

No activities to be undertaken on site during the term of this PoO will produce scrap tyres.

Tyres stored awaiting disposal or transport for take-back, recycling, or waste-to- energy options — should be stockpiled in volumes less than six hundred (600) m 3 in volume and two hundred (200) m 2 in area and at least ten (10) metres from any other tyre storage area. All reasonable and practicable fire prevention measures must be implemented, including removal of grass and other materials within a ten (10) metres radius of the scrap tyre storage area. E2 Where take-back, recycling or waste-to-energy is impracticable and all other stages (options) in the waste hierarchy have been considered, scrap tyres resulting from the mining activities may be disposed of on the mine site in accordance with condition E4 and E5. Disposing of scrap tyres resulting from the mining activities in waste rock emplacements is acceptable, provided tyres are placed as deep in the waste rock as reasonably practicable. Disposal of tyres E3 E4 E5 Scrap tyres resulting from the mining activities disposed within the operational land must not impede saturated aquifers or compromise the stability of the consolidated landform. A Waste Management Plan, in accordance with the Environmental Protection (Waste Management) Policy 2000, must be included in the Plan of Operations. The Waste Management Plan must include re-using and recycling where possible, and a program for safe recycling or disposal of all wastes, and a disposal procedure for hazardous wastes. Waste management E6

No activities to be undertaken on site during the term of this PoO will produce scrap tyres.

No activities to be undertaken on site during the term of this PoO will produce scrap tyres.

No activities to be undertaken on site during the term of this PoO will produce scrap tyres.

No activities to be undertaken on site during the term of this PoO will produce scrap tyres.

Upon commencement of mining activities, the EA holder will prepare and implement a Waste Management Plan.

No regulated waste will be generated, stored, treated or reprocessed as a result of activities to be conducted during the term of this PoO.

Regulated waste E7

All regulated wastes must only be stored, treated, or reprocessed within those

areas designated for those purposes.

26

Plan of Operations

March 2019

AARC Environmental Solutions Pty Ltd