EA Condition
Action Program
There will be no changes to any existing dams during the term of this PoO.
Regulated dams – location H5
The following regulated dams must be wholly located within the control points
defined in Table H1 – Location of regulated dams.
H6 Regulated dams defined in Table H1 – Location of regulated dams must be consistent with the basic details in Table H2 – Basic details of regulated dams.
There will be no changes to any existing dams during the term of this PoO.
H7
The following regulated dams must meet the hydraulic performance criteria
N/A
specified in Table H3 – Hydraulic performance of regulated dams.
There will be no new dam construction on site during the term of this PoO.
Regulated dams – certification and operation H8
Every regulated dam must be constructed in accordance with a certified design plan that has been submitted to the administering authority, and such that the resulting dam will deliver the performance stated in that submitted design plan and that dam is compliant in all respects with this environmental authority. Construction of a regulated dam must not be commenced unless: (a) the licensee has submitted to the administering authority two (2) copies of a design plan, together with the certification of a suitably qualified and experienced person that the design of the regulated dam will deliver the performance stated in the certification and in that submitted design plan; and that dam is compliant in all respects with the Environmental Protection Regulation 2008, the Manual for Assessing Hazard H9 Categories and Hydraulic Performance of Dams, and this environmental authority; and (b) at least twenty (20) business days has passed since the receipt of those documents, or the administering authority notifies the licensee that a design plan and certification has been submitted for that dam. When construction of any regulated dam is complete and prior to commencing operation of that dam, the licensee must submit to the administering authority two (2) copies of a set of 'as constructed' drawings, together with the certification of a suitably qualified and experienced person that the dam 'as constructed' will deliver the performance stated in the certification and in that submitted design plan and that dam is compliant in all respects with the Environmental Protection Regulation 2008, the Manual for Assessing Hazard Categories and Hydraulic Performance of Dams, and this environmental authority. H10
There will be no new dam construction on site during the term of this PoO.
There will be no new dam construction on site during the term of this PoO.
The EA holder does not currently manage or maintain regulated dams. Once applicable, an operational plan will be kept current for each regulated dam.
H11
An operational plan must be kept current for each regulated dam.
31
Plan of Operations
March 2019